MicroLinks Tech H-CAM Instruções de Operação Página 44

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 228
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 43
TM 11574A-OI
2-18
Interval Item
Action
INTERIOR
Before
Cargo Doors Inspect cargo doors for obvious damage such as cracks and holes
affecting serviceability.
Check seals for damage.
Before Lights Check light for security of components.
Before Floor Inspect container floor for punctures and obvious damage.
Inspect floor for blocked or clogged drains.
EXTERIOR
During Refrigeration Unit Ensure Refrigeration unit is operational.
INTERIOR
During Container Check container for free flow of air over cargo. There must be at
least one foot of space between top of cargo and container ceiling.
Make sure cargo does not block evaporator section of refrigeration
unit on front container wall.
After
Refrigeration Unit If the refrigeration unit is not going to be used for several days, it
must be pumped.
Vista de página 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 227 228

Comentários a estes Manuais

Sem comentários